
Phase 4 - Permit in Hand
Building 5- Permit in Hand
± 620,751 SF
±176 Trailer Parks
40’ clear
±423 parking spaces
117 dock doors with 4 ramped drive-ins
4,231 SF spec office
185’ truck court
Divisible
Building 11 - Under Construction, Delivering 12/1/2025
± 373,709 SF (DIVISIBLE)
± 117 trailer parking
± 268 car parking
36’ clear
84 dock door
4,231 SF spec office
185’ truck court
4 drive in ramps
56’ x 51’-8” column spacing w/ 60’ speed bays
ESFR sprinklers
1 air change per hour exhaust fans
Joint sealants and diamond floor sealer throughout
Six (6) 40 lb. Mechanical dock levelers
2 led light fixtures per bay